SMAR LD301 (ZN2) Gage Pressure Transmitter -14.5 to 3600 psi w/ Carbon Steel Mounting Bracket

Code: ITM22010955

LD301-M51I-VU1S-010/I1/H1/ZN2

by:

SMAR ZN2 Navy Grade Gage Pressure Transmitter Hart & 4-20mA output, -14.5 to 3600 psi, 316L Stainless Steel Diaphragm, Silicone Oil


Features

Features

The LD300 Pressure Transmitter Series present a robust solution for measuring pressure in demanding situtations.  This pressure transmitter is based on a field-proven sensor using capacitive technology to measure pressure.  This product is highly configurable and can be configured to your application needs.  

  • ±0.15% of URL Stability - Guarantee for 12 Years
  • ± 0.04% High Accuracy
  • Bi-directional Flow Measurement
  • Advanced Diagnostics
  • Largest Library of Function
  • 120:1 Rangeability
  • Tank Linearization
  • 100 ms Total Response Time
  • PID Control Capability
  • Instantiable Function Blocks
  • Supported by DD, EDDL and FDT/DTM
  • Three Technology Options

*See Manufacturer's Documentation for Full Product Features

Specifications

Specifications

​Need a different configuration of this product?  Contact us, we can assist you!

  • Product Series: LD300 - Navy Grade & Certified
  • Diaphragm Material: 316L Stainless Steel, Gold Plated
  • Fill Fluid: Silicone Oil
  • Flange(s), Adapter(s) and Drain/Vent Valves Material: 316L Stainless Steel
  • Wetted O'Ring Material(s): Viton
  • Process Connection: J1926
  • Drain/Vent Position: Top
  • Digital Indicator Included: Yes

Downloads

Downloads

Specification Documents

LD300_DataSheet.pdf

Availability

Availability

Contact us for availability

Please Note: Currently the ZN2 models are going obsolete due to supply chain and availability of material. Fortunately, SCI with Huntington Ingalls are working in combination with the NAVY to get the new ZN2+ models approved and qualified (we can add the procedures if needed). If you your project does not require MIL-SPEC qualifications they are available for quote right now. If you do require ZN2+s to be qualified they will be ready Fall of 2024 (dependent on testing approvals by the NAVY

Need a quote for products or services? Click here to submit a Request For Quote.Request A Quote

 

To top